Brejning windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Brejning
- Country: Denmark
- Total power: 11 MW
- Estimated annual production: 27 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/08
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 45 m
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/12
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 45 m
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000/02
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 45.3 m
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/11
- 3 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 50 m
- Total nominal power: 1,980 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1989/04
- 0 turbine(s) Vestas V20/100 (power 100 kW, diameter 20 m)
- Hub height: 23.4 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #6:
- Commissioning: 1992/12
- 0 turbine(s) Vestas V20/100 (power 100 kW, diameter 20 m)
- Hub height: 23.4 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #7:
- Commissioning: 2009/07
- 4 turbine(s) Vestas V90/1800 (power 1800 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010