Gunderup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Gunderup
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/01
- 2 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 45 m
- Total nominal power: 1,320 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1998/11
- 4 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 45 m
- Total nominal power: 2,640 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1989/08
- 1 turbine(s) Wind World W2500/25 (power 150 kW, diameter 25 m)
- Hub height: 31 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1989/07
- 1 turbine(s) Wind World
- Hub height: 31 m
- Total nominal power: 100 kW
- Operational
- Onshore wind farm