Gestengene windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Gestengene
- Country: Denmark
- Total power: 6 MW
- Estimated annual production: 15 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/06
- 2 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 45 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1991/03
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1994/09
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm