Horbelev windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Horbelev
- Country: Denmark
- Total power: 2 MW
- Estimated annual production: 4 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/01
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1998/12
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 35 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1997/05
- 1 turbine(s) Bonus
- Hub height: 40 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1992/10
- 0 turbine(s) Bonus B31/300 (power 300 kW, diameter 31 m)
- Hub height: 30 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #5:
- Commissioning: 1991/03
- 0 turbine(s) Bonus B24/150 (power 150 kW, diameter 24 m)
- Hub height: 30 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page