Kobelev windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Kobelev
- Country: Denmark
- Total power: 3 MW
- Estimated annual production: 8 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/05
- 1 turbine(s) Bonus B54/1000 (power 1000 kW, diameter 54.1 m)
- Hub height: 50 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1998/01
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1998/02
- 2 turbine(s) Bonus
- Hub height: 35 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/09
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 35 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm