Stadager windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Stadager
- Country: Denmark
- Total power: 2 MW
- Estimated annual production: 4 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/01
- 2 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 42 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1997/01
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 42 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page