Krejbjerg windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Krejbjerg
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1995/12
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 50 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1995/05
- 1 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1996/09
- 2 turbine(s) Vestas V42/600 (power 600 kW, diameter 42 m)
- Hub height: 40 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1995/12
- 1 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 40.5 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1994/12
- 1 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 40.5 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1989/12
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1990/02
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #8:
- Commissioning: 1994/10
- 1 turbine(s) Vestas V29/225 (power 225 kW, diameter 29 m)
- Hub height: 27 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm