Stenderup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Stenderup
- Country: Denmark
- Total power: 8 MW
- Estimated annual production: 21 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/12
- 2 turbine(s) Bonus B62/1300 (power 1300 kW, diameter 62 m)
- Hub height: 49 m
- Total nominal power: 2,600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002/09
- 1 turbine(s) Bonus B54/1000 (power 1000 kW, diameter 54.1 m)
- Hub height: 50 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1997/11
- 1 turbine(s) Nordtank NTK600/43 (power 600 kW, diameter 43 m)
- Hub height: 44 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1998/12
- 1 turbine(s) Wincon W600/45 (power 600 kW, diameter 45 m)
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1997/06
- 2 turbine(s) Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height: 45 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1987/12
- 0 turbine(s) Bonus B23/150 (power 150 kW, diameter 23 m)
- Hub height: 24 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #7:
- Commissioning: 1989/02
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page