Rom windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Rom
- Country: Denmark
- Total power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1994/11
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 40.5 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1996/05
- 1 turbine(s) Nordex N43/600 (power 600 kW, diameter 43 m)
- Hub height: 40.5 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1995/11
- 1 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 40 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1992/01
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1990/12
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm