Bregninge windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Bregninge
- Country: Denmark
- Total power: 1 MW
- Estimated annual production: 2 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1990/10
- 1 turbine(s) Nordtank
- Hub height: 35 m
- Total nominal power: 400 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1988/10
- 2 turbine(s) Dencon Tornado 250/26 (power 250 kW, diameter 26 m)
- Hub height: 31.5 m
- Total nominal power: 400 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1990/09
- 1 turbine(s) Wind World W150/28 (power 150 kW, diameter 28 m)
- Hub height: 31 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm