Brund windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Brund
- Country: Denmark
- Total power: 1 MW
- Estimated annual production: 2 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Brund
- Commissioning: 1995/08
- 1 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Hub height: 31 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #2:
- City: Brund
- Commissioning: 1996/04
- 1 turbine(s) Nordtank NTK300/31 (power 300 kW, diameter 31 m)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #3:
- City: Brund
- Commissioning: 1990/06
- 2 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 32 m
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2013
Complete/correct this sheet: contact page