Froslev windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Froslev
- Country: Denmark
- Total power: 6 MW
- Estimated annual production: 15 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1998/09
- 5 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 46 m
- Total nominal power: 3,750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1994/12
- 2 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 40.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1989/12
- 1 turbine(s) Danwin 27/225 (power 225 kW, diameter 27 m)
- Hub height: 30 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1991/10
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1989/01
- 3 turbine(s) Danwin 24/200 (power 200 kW, diameter 24 m)
- Hub height: 30 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1993/04
- 1 turbine(s) Wincon W200/26 (power 200 kW, diameter 26 m)
- Hub height: 30 m
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1991/01
- 1 turbine(s) Vestas V20/100 (power 100 kW, diameter 20 m)
- Hub height: 24 m
- Total nominal power: 100 kW
- Operational
- Onshore wind farm