Sogard windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Sogard
- Country: Denmark
- Total power: 10 MW
- Estimated annual production: 24 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1998/07
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 45 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1991/12
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #3:
- Commissioning: 1988/03
- 1 turbine(s) Neg Micon
- Hub height: 27 m
- Total nominal power: 130 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1990/03
- 1 turbine(s) Vestas V20/100 (power 100 kW, diameter 20 m)
- Hub height: 23 m
- Total nominal power: 100 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2010/06
- 3 turbine(s) Vestas V90/3000 (power 3000 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page