Hagenburg windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Hagenburg
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/08
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002/09
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2002/09
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2002/09
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011
Complete/correct this sheet: contact page