Generalities

PDF

Details


Part #1:

  • Commissioning: 2008
  • 3 turbines: (manufacturer name not available)
  • Total nominal power: 5,400 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, January 19 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 8 %
  • Expected production: 10,350 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2006
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, January 19 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 9.8 %
  • Expected production: 9,440 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Commissioning: 2002
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,650 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Thursday, January 19 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 9.8 %
  • Expected production: 3,890 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 53░ 20' 17.6"
  • Longitude: 8░ 11' 23"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 53░ 20' 17.6"
  • Longitude: 8░ 11' 23"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53░ 20' 17.6"
  • Longitude: 8░ 11' 23"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015