Lomba do Vale windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Lomba do Vale
- Country: Portugal
- County / Zone: Vila Real
- Total power: 21 MW
- Estimated annual production: 52 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2010/07
- 7 turbine(s) Nordex N90/2300 (power 2300 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 16,100 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2010/04
- 2 turbine(s) Nordex N90/2500 (power 2500 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2011
Complete/correct this sheet: contact page