Wind farms
Lomba do Vale (Portugal)| Lomba do Vale (Portugal) |
|
| Operational (21,1 MW) |

| Country | Portugal |
| County/Zone | Vila Real (Norte) |
| City | Cabeceiras de Basto - Montalegre |
| Wind farm type | Onshore wind farm |

![]() | 5 MW commissioned |
![]() | 16.1 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Nordex N90/2300 (x 7) |
| Operational | Nordex N90/2500 (x 2) |

![]() | |

| City | Cabeceiras de Basto, Montalegre |
| Commissioning | ![]() |
| Turbines | 7x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 16,100 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 41° 36' 9.3" - Longitude -7° 59' 22.5" |
| Precise localization | Yes |
| City | Cabeceiras de Basto, Montalegre |
| Commissioning | ![]() |
| Turbines | 2x Nordex N90/2500 (power 2,500 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 5,000 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 41° 36' 9.3" - Longitude -7° 59' 22.5" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Serra da Cabreira (7 km) Alto do Talefe (7 km) Vilar Chão (7 km) Lomba Seixa (8 km) Tâmega (10 km) Ruivaes (10 km) Alto da Vaca (10 km) Penouta (PT) (13 km) Serra do Barroso (13 km) Serra do Barroso III (15 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Vila Real (Norte) : 684.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||