[Back to previous page]
Generalities
|
|
Details
Part #1:
- 3 turbines: Enercon
- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Wednesday, September 27 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 14.4 %
- Expected production: 23,920 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Commissioning:

- 8 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Wednesday, September 27 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15.6 %
- Expected production: 60,090 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 40' 50.1"
- Longitude: -7° 50' 59"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 40' 50.1"
- Longitude: -7° 50' 59"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 December 2022
Complete/correct this sheet: