Generalities
|
|
Details
Part #1:
- Part: Lomba Seixa I
- City: Montelegre
- Commissioning:

- 10 turbines: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
- Hub height:

- Total nominal power: 13,000 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Ventient Energy
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.8 %
- Expected production: 21,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Lomba Seixa II
- City: Montelegre
- Commissioning:

- 8 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:

- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Ventient Energy
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.9 %
- Expected production: 19,860 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Lomba Seixa I
- Latitude: 41° 49' 47.9"
- Longitude: -7° 47' 24"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Lomba Seixa II
- Latitude: 41° 49' 47.9"
- Longitude: -7° 47' 24"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 December 2022
Complete/correct this sheet: