Generalities

PDF

Details


Part #1:

  • City: Remlingen
  • Commissioning: 2006/07
  • 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height: 105 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Wotan Gruppe
  • Operator: Wotan Gruppe

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.3 %
  • Expected production: 170 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Remlingen
  • Commissioning: 2000
  • 5 turbines: (manufacturer name not available)
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Volkswind

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.2 %
  • Expected production: 420 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Remlingen
  • Commissioning: 2010
  • 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 113 m
  • Total nominal power: 9,200 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 6.3 %
  • Expected production: 13,920 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Remlingen
  • Commissioning: 2010
  • 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 64 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 3.2 %
  • Expected production: 3,060 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Remlingen
  • Commissioning: 2012
  • 6 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
  • Hub height: 140 m
  • Total nominal power: 14,400 kW
  • Operational
  • Onshore wind farm
  • Developer: ABO-Wind
  • Operator: ABO-Wind

       Production forecast

  • From Monday, March 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 13.4 %
  • Expected production: 46,420 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52░ 6' 53"
  • Longitude: 10░ 40' 27.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 6' 50.1"
  • Longitude: 10░ 40' 37.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 49░ 48' 16.9"
  • Longitude: 9░ 41' 41.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 49░ 48' 16.9"
  • Longitude: 9░ 41' 41.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 49░ 48' 16.9"
  • Longitude: 9░ 41' 41.1"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 7 November 2016
Complete/correct this sheet:


Eoltech