Generalities

PDF

Details


Part #1:

  • City: Remlingen
  • Commissioning: 2006/07
  • 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height: 105 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Wotan Gruppe
  • Operator: Wotan Gruppe

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 47.8 %
  • Expected production: 22,960 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Remlingen
  • Commissioning: 2000
  • 5 turbines: (manufacturer name not available)
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Volkswind

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 42.2 %
  • Expected production: 91,230 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Remlingen
  • Commissioning: 2010
  • 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 113 m
  • Total nominal power: 9,200 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom
  • Source: http://www.windstrom.de/list-view.html

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 26.1 %
  • Expected production: 57,540 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Remlingen
  • Commissioning: 2010
  • 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Hub height: 64 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom
  • Source: http://www.windstrom.de/list-view.html

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 27.1 %
  • Expected production: 25,990 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Remlingen
  • Commissioning: 2012
  • 6 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
  • Hub height: 140 m
  • Total nominal power: 14,400 kW
  • Operational
  • Onshore wind farm
  • Developer: ABO-Wind
  • Operator: ABO-Wind
  • Source: https://www.abo-wind.com/de/referenzen/windkraftanlagen.html

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 41.3 %
  • Expected production: 142,900 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 49° 48' 40.5"
  • Longitude: 9° 39' 20.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 49° 48' 40.5"
  • Longitude: 9° 39' 20.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 49° 48' 16.9"
  • Longitude: 9° 41' 41.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 49° 48' 16.9"
  • Longitude: 9° 41' 41.1"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 49° 48' 16.9"
  • Longitude: 9° 41' 41.1"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 21 September 2017
Complete/correct this sheet: