Kabertene windfarm (Algeria)
[Back to previous page]
Generalities
- Wind farm name: Kabertene
- Country: Algeria
- Total power: 24 MW
- Estimated annual production: 60 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Adrar
- Turbine(s) Vensys
- Total nominal power: 14,000 kW
- Under construction
- Onshore wind farm
- Developed by: Cegelec
Part #2:
- City: Adrar
- 12 turbine(s) Gamesa G52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 10,200 kW
- Under construction
- Onshore wind farm
- Developed by: CEEG
Update for this sheet: 11/2011
Complete/correct this sheet: contact page