Wind power and windfarms database
Greensolver

English English Deutsch Español


Eoltech

Online access > Wind farms > Cortijo de Guerra I (Spain)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • City: Puerto Real
  • Commissioning: 2007/12
  • 14 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Hub height: 105 m
  • Total nominal power: 42,000 kW
  • Operational
  • Onshore wind farm
  • Developer: ImWind
  • Operator: WKN AG

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 21.9 %
  • Expected production: 220,510 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Puerto Real
  • 1 turbine: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm
  • Developer: ImWind
  • Operator: WKN AG

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 12.9 %
  • Expected production: 9,260 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 36° 31' 48"
  • Longitude: -6° 11' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 36° 31' 48"
  • Longitude: -6° 11' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 11/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising