The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Cortijo de Guerra I (Spain)


[Back to previous page]

Spain wind farms file: buy now

Generalities

PDF

Details


Part #1:

  • City: Puerto Real
  • Commissioning: 2007/12
  • 14 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Hub height: 105 m
  • Total nominal power: 42,000 kW
  • Operational
  • Onshore wind farm
  • Developer: ImWind
  • Operator: WKN AG
  • Source: http://www.aeeolica.org/en/about-wind-energy/wind-energy-in-spain/wind-map/
  • Source: http://www.imwind.at/index.php?article_id=17&clang=0
  • Source: http://www.wkn-ag.de/referenzen/windparks/

       Production forecast

  • From Tuesday, October 24 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 51.4 %
  • Expected production: 518,490 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Puerto Real
  • 1 turbine: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm
  • Developer: ImWind
  • Source: http://www.aeeolica.org/en/about-wind-energy/wind-energy-in-spain/wind-map/
  • Source: http://www.imwind.at/index.php?article_id=17&clang=0

       Production forecast

  • From Tuesday, October 24 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 51.4 %
  • Expected production: 37,040 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 36° 31' 48"
  • Longitude: -6° 11' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 36° 31' 48"
  • Longitude: -6° 11' 24"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 21 September 2017
Complete/correct this sheet: