Dronninglund windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Dronninglund
- Country: Denmark
- Total power: 6 MW
- Estimated annual production: 14 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005/06
- 4 turbine(s) Vestas NM52 (power 900 kW, diameter 52 m)
- Hub height: 54 m
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2008/02
- 1 turbine(s) Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height: 54 m
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2008/03
- 1 turbine(s) Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height: 54 m
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1989/05
- 1 turbine(s) Wind World W2320/160 (power 160 kW, diameter 23.2 m)
- Hub height: 30 m
- Total nominal power: 160 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1988/08
- 1 turbine(s) Wind World W2320/150 (power 150 kW, diameter 23.2 m)
- Hub height: 30 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1988/12
- 0 turbine(s) Bonus B23/150 (power 150 kW, diameter 23 m)
- Hub height: 32 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page