Hvidbjerg windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Hvidbjerg
- Country: Denmark
- Total power: 6 MW
- Estimated annual production: 14 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/01
- 2 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 48 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/10
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1997/11
- 1 turbine(s) Neg Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height: 46 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/11
- 1 turbine(s) Neg Micon M1500-750 (power 750 kW, diameter 44 m)
- Hub height: 46 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1999/05
- 1 turbine(s) Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height: 40 m
- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1990/12
- 2 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1997/05
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #8:
- Commissioning: 1989/12
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #9:
- Commissioning: 1991/10
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #10:
- Commissioning: 1991/12
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Part #11:
- Commissioning: 1989/10
- 1 turbine(s) Bonus B23/150 (power 150 kW, diameter 23 m)
- Hub height: 24.5 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm