The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access Wind farms Baby (Poland)


Sign up    Log in    Search

[Back to previous page]

Poland wind farms file


Generalities

Details


Part #1:

  • City: Goscimowice Drugie
  • Commissioning:
  • 1 turbine: Newinco 23 PI 200/250 (power 250 kW, diameter 23.1 m)
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm

Part #2:

  • City: Goscimowice Drugie
  • Commissioning:
  • 1 turbine: Newinco 23 PI 200/250 (power 250 kW, diameter 23.1 m)
  • Total nominal power: 250 kW
  • Dismantled (2012)
  • Onshore wind farm

Part #3:

  • City: Goscimowice Drugie
  • Commissioning:
  • 2 turbines: Vestas V25/200 (power 200 kW, diameter 25 m)
  • Total nominal power: 400 kW
  • Dismantled (2012)
  • Onshore wind farm

Localisation


Part #1:


Part #2:


Part #3:



Update for this sheet: 24 September 2025





The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page