[Back to previous page]
Generalities
|
|
Details
- City: Albacete
- Commissioning:

- 1 turbine: Ecotecnia 110 (power 3 000 kW, diameter 110 m)
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Ecotecnia
Production forecast
- From Monday, March 27 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 18.4 %
- Expected production: 13,280 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 39° 2' 38.7"
- Longitude: -1° 44' 46.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 February 2023