[Back to previous page]
Generalities
- Wind farm name: Montes de Cierzo I
- Country: Spain
- County / Zone: Navarra
|
|
Details
- City: Tudela
- Commissioning:

- 41 turbines: Ecotecnia 44 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 24,600 kW
- Operational
- Onshore wind farm
- Operator: ACS
- Owner:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 52.8 %
- Expected production: 311,450 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 42° 3' 59.8"
- Longitude: -1° 45' 48"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: