Alto Douro (Portugal)
Operational (253,2 MW)


Localisation  

Country Portugal
County/Zone Viseu (Centro/Norte)
City Armamar - Moimenta da Beira - Vila Nova de Paiva
Wind farm type Onshore wind farm

Key dates  

 11.5 MW commissioned
 11.5 MW commissioned
 14 MW commissioned
 34.5 MW commissioned
 46 MW commissioned
 32.2 MW commissioned
 50.6 MW commissioned
 9.2 MW commissioned
 2.3 MW commissioned
 4.6 MW commissioned
 13.8 MW commissioned
 11.5 MW commissioned
 11.5 MW commissioned

Players  

Developers
#ND
Operator #ND
Owner #ND
Manufacturer Enercon

Turbines   

OperationalEnercon E82/2300 (x 104)
OperationalEnercon E82/2000 (x 7)

Sources  

 

Details  

Part #1



PartArmamar
CityArmamar
Commissioning
Turbines6x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power13,800 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #2



PartArmamar
CityArmamar
Commissioning
Turbines2x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power4,600 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #3



PartArmamar
CityArmamar
Commissioning
Turbines7x Enercon E82/2000 (power 2,000 kW, diameter 82 m)
Hub height
Total nominal power14,000 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #4



PartArmamar II
CityArmamar
Commissioning
Turbines5x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power11,500 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #5



PartRanhados
City#ND
Commissioning
Turbines5x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Total nominal power11,500 kW
StatusOperational
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #6



PartSendim
City#ND
Commissioning
Turbines20x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power46,000 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #7



PartSerra da Nave
CityMoimenta da Beira, Vila Nova de Paiva
Commissioning
Turbines14x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power32,200 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #8



PartSerra da Nave
CityMoimenta da Beira, Vila Nova de Paiva
Commissioning
Turbines5x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power11,500 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #9



PartSerra de Chavães
CityVila Nova de Paiva
Commissioning
Turbines15x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power34,500 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #10



PartSerra de Sampaio
CityVila Nova de Paiva
Commissioning
Turbine1x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power2,300 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #11



PartSerra de Sampaio
CityVila Nova de Paiva
Commissioning
Turbines4x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power9,200 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #12



PartSerra de Sampaio
CityVila Nova de Paiva
Commissioning
Turbines5x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power11,500 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Part #13



PartTestos II
City#ND
Commissioning
Turbines22x Enercon E82/2300 (power 2,300 kW, diameter 82 m)
Hub height
Total nominal power50,600 kW
StatusOperational
Developer
CoordinatesLatitude 41° 4' 10.5" - Longitude -7° 34' 36.7"
Precise localizationNo

Databases

     

Portugal (11.1 GW)
Europe (654.1 GW)
World (2,450.5 GW)

All databases



PDF Summary




Nearby wind farms

Leomil (14 km)
Douro Sul (14 km)
Sirigo (20 km)
Vigia (20 km)
Nave (20 km)
Santa Helena (PT) (21 km)
Mourisca (23 km)
Meadas (24 km)
Testos (25 km)
Fonte da Mesa II (25 km)


Insights

Production capacity

Portugal : 5,990.0 MW (end of 2025)
Viseu (Centro/Norte) : 1,161.9 MW (*)


Légende

#ND : no data
(*) : according to The Wind Power database


Update for this sheet

1 December 2023




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page