[Back to previous page]
Generalities
|
|
Details
- City: Oncala
- Commissioning:

- 33 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 24,750 kW
- Operational
- Onshore wind farm
- Developer: Cetesa
- Operator: Cetesa
Production forecast
- From Friday, December 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 53.6 %
- Expected production: 318,340 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 41° 58' 11.9"
- Longitude: -2° 18' 36"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 11 August 2023
Complete/correct this sheet: