Generalities
|
|
Details
Part #1:
- City: Cinfaes
- Commissioning:

- 8 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Enernova
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Thursday, August 18 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.2 %
- Expected production: 6,200 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Cinfaes
- Commissioning:

- 1 turbine: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: Enernova
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Thursday, August 18 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.2 %
- Expected production: 1,150 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 38' 47"
- Longitude: -8° 2' 57"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 38' 47"
- Longitude: -8° 2' 57"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 June 2022
Complete/correct this sheet: