Generalities
|
|
Details
- Commissioning: 2008
- 3 turbines: Nordex S70 (power 1 500 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
- Operator: Drobil - energo. s.r.o.
Production forecast
- From Friday, December 13 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 18.8 %
- Expected production: 20,310 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 50° 30' 6.8"
- Longitude: 13° 14' 42.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 19 March 2019