Southwest Offshore Wind Project (South Korea)| Southwest Offshore Wind Project (South Korea) |
|
| Planned (2.400 MW) - Operational (60 MW) |

| Country | South Korea |
| County/Zone | Offshore |
| Wind farm type | Offshore wind farm |

![]() | 21 MW commissioned |
![]() | 39 MW commissioned |

| Developers |
![]() ![]() |
| Operator | #ND |
| Owners |
![]() ![]() ![]() ![]() #ND |
| Manufacturers |
#ND |

| Planned | #ND |
| Operational | Doosan WinDS3000/134 (x 13) |
| Operational | Doosan WinDS3000/100 (x 7) |

![]() | |

| Part | Phase 1 (Test Site) |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 7x Doosan WinDS3000/100 (power 3,000 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 21,000 kW |
| Status | Operational |
| Developer | ![]() |
| Owners | / /#ND |
| Coordinates | Latitude 35° 28' 55.6" - Longitude 126° 18' 31.8" |
| Depth | -10 m |
| Precise localization | No |
| Distance from shore | 12 km |
| Part | Phase 1 (Test Site) |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 13x Doosan WinDS3000/134 (power 3,000 kW, diameter 134 m) |
| Hub height | ![]() |
| Total nominal power | 39,000 kW |
| Status | Operational |
| Developer | ![]() |
| Owners | / /#ND |
| Coordinates | Latitude 35° 28' 55.6" - Longitude 126° 18' 31.8" |
| Depth | -10 m |
| Precise localization | No |
| Distance from shore | 12 km |
Databases ![]() South Korea (68.3 GW) Asia (1,031.8 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Yeonggwang Chilhae 1 (11 km) Yeonggwang Nakwol (24 km) Yeonggwang Chilhae 2 (24 km) Anma (31 km) Gochang (32 km) Yeonggwang Hanbit (35 km) Yeonggwang Chilsan (37 km) Yongwang Yawol (40 km) Yeonggwang Duuri (42 km) Yeonggwang Baeksu (44 km) | ||
|
Insights Production capacity South Korea : 2,451.0 MW (end of 2025) Offshore : 66,377.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 25 May 2026 |
||