[Back to previous page]
Details
- City: La Riba de Valdelucio
- Commissioning:

- 31 turbines: Ecotecnia 80 1.6 (power 1 670 kW, diameter 80 m)
- Total nominal power: 51,770 kW
- Operational
- Onshore wind farm
- Developers: SeeBA EnergyFarming/Cobra
- Operator: ACS
- Source:

Production forecast
- From Friday, May 27 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.5 %
- Expected production: 154,740 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 42° 45' 14.6"
- Longitude: -4° 3' 2.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 January 2022
Complete/correct this sheet: