Generalities
|
|
Details
Part #1:
- City: Geringswalde
- Commissioning:

- 2 turbines: Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developer: Energieanlagen FB
Production forecast
- From Friday, March 24 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 96.3 %
- Expected production: 27,730 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Geringswalde
- City: Erlau
- Commissioning:

- 1 turbine: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 660 kW
- Operational
- Onshore wind farm
- Developer: Energieanlagen FB
- Operator: Energieanlagen FB
- Owner:

- Source:

Production forecast
- From Friday, March 24 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 77.7 %
- Expected production: 12,310 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 4' 9.3"
- Longitude: 12° 57' 11.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Geringswalde
- Latitude: 51° 4' 9.3"
- Longitude: 12° 57' 11.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 29 November 2022