Atsumi (Japan)| Atsumi (Japan) |
|
| Operational (10,5 MW) |

| Country | Japan |
| County/Zone | Aichi (Chubu) |
| Wind farm type | Onshore wind farm |

![]() | 3 MW commissioned |
![]() | 7.5 MW commissioned |

| Developer |
![]() |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | GE Vernova 1.5s (x 7) |

| No source available |

| Part | North |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 2x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 34° 39' 33.6" - Longitude 137° 4' 21.9" |
| Precise localization | Yes |
| Part | South |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 5x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Hub height | ![]() |
| Total nominal power | 7,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 34° 38' 20.8" - Longitude 137° 3' 12.3" |
| Precise localization | Yes |
Databases ![]() Japan (61.7 GW) Asia (1,032.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tahara City (23 km) Tahara (23 km) Hekinan Aichi (28 km) MITO (29 km) Mie University (49 km) Watarai (52 km) Hamamatsu City (58 km) Hamamatsu (65 km) Iwata (68 km) Misato (68 km) | ||
|
Insights Production capacity Japan : 6,238.0 MW (end of 2025) Aichi (Chubu) : 39.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 September 2024 |
||