Generalities
|
|
Details
Part #1:
- City: Lichtenau
- Commissioning:

- 1 turbine: Nordex N131/3600 (power 3 600 kW, diameter 131 m)
- Hub height:

- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
Production forecast
- From Tuesday, March 28 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 9.9 %
- Expected production: 8,520 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Paderborn
- Commissioning:

- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Operator: Dezentrale Energie
- Source:

Part #3:
- City: Borchen
- Commissioning:

- 1 turbine: Enercon E82/2350 (power 2 350 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,350 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 40' 2.3"
- Longitude: 8° 51' 38.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 40' 4.1"
- Longitude: 8° 43' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 39' 34.7"
- Longitude: 8° 51' 3.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 13 March 2023