[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Phase 1
- Turbine(s): (manufacturer name not available)
- Total nominal power: 75,000 kW
- Approved
- Offshore wind farm
Part #2:
- Part: Phase 2
- Turbine(s): (manufacturer name not available)
- Total nominal power: 76,000 kW
- Planned
- Offshore wind farm
- Developer: PECC2
- Owner:

Localisation
Part 1 : no data.
Part #2:
- Part: Phase 2
- Latitude: 8° 58' 48"
- Longitude: 105° 25' 12"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 10 August 2020
Complete/correct this sheet: