Wind farms
Sinjido (South Korea)| Sinjido (South Korea) |
|
| Operational (17,325 MW) |

| Country | South Korea |
| County/Zone | Jeollanam-do |
| City | Wando-gun |
| Wind farm type | Onshore wind farm |

![]() | 17.325 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Siemens-Gamesa SG 3.4-132 (x 5) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 34° 18' 48.8" - Longitude 126° 52' 41.4" |
| Precise localization | Yes |
Databases ![]() South Korea (68.3 GW) Asia (1,032.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Wando Geumil (16 km) Wando - Kolon Global (17 km) Wando Jangbongo (21 km) Haenam Gunghang (25 km) Wando Island (26 km) Yeonggwang Future (27 km) Geomundo (30 km) Goheung Sisan (31 km) Yeosu Geomodo (32 km) Admiral Lee (34 km) | ||
|
Insights Production capacity South Korea : 2,451.0 MW (end of 2025) Jeollanam-do : 290.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 9 May 2023 |
||