[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Val d’Auge
 - Commissioning: 

 - 3 turbines: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
 - Hub height: 

 - Total nominal power: 9,000 kW (downrated turbines)
 - Operational
 - Onshore wind farm
 - Developer: TTR Energy
 - Operator: TTR Energy
 
Part #2: 
- City: Val d’Auge
 - Commissioning: 

 - 1 turbine: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
 - Hub height: 

 - Total nominal power: 4,000 kW (downrated turbine)
 - Operational
 - Onshore wind farm
 - Developer: TTR Energy
 - Operator: TTR Energy
 
Localisation
Part #1: 
- Latitude: 45° 50' 11.3"
 - Longitude: -0° 5' 25.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 45° 50' 11.3"
 - Longitude: -0° 5' 25.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Pictures

Author: Soan -  License: All right reserved
Picture reference: 16072 - Date: 2024

Author: Soan -  License: All right reserved
Picture reference: 16073 - Date: 2024

Author: Soan -  License: All right reserved
Picture reference: 16074 - Date: 2024

Author: Soan -  License: All right reserved
Picture reference: 16075 - Date: 2024

Author: Soan -  License: All right reserved
Picture reference: 16076 - Date: 2024

Author: Soan -  License: All right reserved
Picture reference: 16077 - Date: 2024

Author: Soan -  License: All right reserved
Picture reference: 16078 - Date: 2024
 
Update for this sheet: 0  
Complete/correct this sheet: