[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
Part #2: 
- Commissioning: 

 - 1 turbine: (manufacturer name not available)  
 - Total nominal power: 300 kW
 - Operational
 - Onshore wind farm
 - Operator: Hokkaido Electric Power Co
 
Part #3: 
- Commissioning: 

 - 1 turbine: (manufacturer name not available)  
 - Total nominal power: 250 kW
 - Operational
 - Onshore wind farm
 - Operator: Hokkaido Electric Power Co
 
Localisation
Part #1: 
- Latitude: 43° 5' 4.5"
 - Longitude: 140° 29' 8.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 43° 5' 4.5"
 - Longitude: 140° 29' 8.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 43° 5' 4.5"
 - Longitude: 140° 29' 8.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 21 September 2017
Complete/correct this sheet: