Part #1: 
- Commissioning: 

 - 2 turbines: (manufacturer name not available)  
 - Total nominal power: 450 kW
 - Operational
 - Onshore wind farm
 - Operator: Heiwa kankou kaihatu
 
Part #2: 
- Commissioning: 

 - 4 turbines: Lagerwey  
 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Tenei city
 
Localisation
Part #1: 
- Latitude: 37° 15' 35.9"
 - Longitude: 140° 11' 23.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 37° 15' 35.9"
 - Longitude: 140° 11' 23.9"
 - Geodetic system: WGS84
 - Precise localization: no
 