[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Gerstungen
- Commissioning:

- 1 turbine: Repower MD77 (power 1 500 kW, diameter 77 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: GEWI
- Operator: GEWI
- Owner:

- Source:

Production forecast
- From Friday, September 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 48.6 %
- Expected production: 17,480 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Förtha
- Commissioning:

- 2 turbines: Enercon E58/1000 (power 1 000 kW, diameter 58 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, September 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 23.5 %
- Expected production: 11,300 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Marksuhl
- City: Gerstungen
- Commissioning:

- 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, September 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 16.1 %
- Expected production: 2,310 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 55' 39.8"
- Longitude: 10° 13' 15.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 50° 55' 38.6"
- Longitude: 10° 13' 13.1"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Marksuhl
- Latitude: 50° 55' 24.8"
- Longitude: 10° 13' 13.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 June 2022
Complete/correct this sheet: