Wind farms
Geycek (Turkey)| Geycek (Turkey) |
|
| Operational (150 MW) |

| Country | Turkey |
| County/Zone | Kirsehir |
| City | Mucur |
| Wind farm type | Onshore wind farm |

![]() | 58 MW commissioned |
![]() | 30 MW commissioned |
![]() | 62 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E82/2000 (x 60) |
| Operational | Enercon E82/3000 (x 10) |

![]() | |
![]() | |

| City | Mucur |
| Commissioning | ![]() |
| Turbines | 29x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 58,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 39° 6' 28.3" - Longitude 34° 26' 53.5" |
| Precise localization | Yes |
| City | Mucur |
| Commissioning | ![]() |
| Turbines | 10x Enercon E82/3000 (power 3,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 30,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 39° 6' 28.3" - Longitude 34° 26' 53.5" |
| Precise localization | Yes |
| City | Mucur |
| Commissioning | ![]() |
| Turbines | 31x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 62,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 39° 6' 28.3" - Longitude 34° 26' 53.5" |
| Precise localization | Yes |
Databases ![]() Turkey (12.5 GW) Asia (1,032.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Atakale (93 km) Yüksekyayla (104 km) | ||
|
Insights Production capacity Turkey : 15,935.0 MW (end of 2025) Kirsehir : 150.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 27 March 2023 |
||