Wind farms
Charmont-sous-Barbuise (France)| Charmont-sous-Barbuise (France) |
|
| Operational (24 MW) |

| Country | France |
| County/Zone | 10 (Grand Est) |
| City | Charmont-sous-Barbuise |
| Wind farm type | Onshore wind farm |

![]() | 12 MW commissioned |
![]() | 12 MW commissioned |

| Developer |
![]() |
| Operators |
![]() ![]() ![]() |
| Owners |
![]() ![]() |
| Manufacturer |
|

| Operational | Repower MM92 (x 12) |

![]() | |
![]() | |
![]() | |

| Part | Champ Renoir (Ventelec) |
| City | Charmont-sous-Barbuise |
| Commissioning | ![]() |
| Turbines | 6x Repower MM92 (power 2,000 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operators | /![]() |
| Owner | ![]() |
| Coordinates | Latitude 48° 26' 51.8" - Longitude 4° 10' 2.3" |
| Precise localization | Yes |
| Part | La Côte Blanche (Clemec) |
| City | Charmont-sous-Barbuise |
| Commissioning | ![]() |
| Turbines | 6x Repower MM92 (power 2,000 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 48° 26' 14.9" - Longitude 4° 11' 52.7" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms 4 vents (5 km) Les Monts (5 km) Les Coteaux (9 km) Côte du pommier (10 km) Chapelle d’Eole (11 km) Val d’Eole (11 km) Plaine Auboise (11 km) Mont de Saint Benoît (11 km) Parc des Monts (13 km) Entre Seine et Aube (14 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 10 (Grand Est) : 1,110.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 June 2026 |
||