Espinhaço de Cao (Portugal)| Espinhaço de Cao (Portugal) |
|
| Operational (10 MW) |

| Country | Portugal |
| County/Zone | Faro (Algarve) |
| City | Aljezur |
| Wind farm type | Onshore wind farm |

![]() | 2 MW commissioned |
![]() | 8 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Repower MM92 (x 5) |

![]() | |

| City | Aljezur |
| Commissioning | ![]() |
| Turbines | 4x Repower MM92 (power 2,000 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 8,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 13' 11.8" - Longitude -8° 47' 0.1" |
| Precise localization | Yes |
| City | Aljezur |
| Commissioning | ![]() |
| Turbine | 1x Repower MM92 (power 2,000 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 13' 11.8" - Longitude -8° 47' 0.1" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Guerreiros (2 km) Bordeira (2 km) Corte dos Alamos (6 km) Barao de Sao Joao (6 km) Lagoa Funda (14 km) Vila do Bispo I (15 km) Raposeira (15 km) Vila do Bispo II (16 km) Madrinha (17 km) Pico Alto (49 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Faro (Algarve) : 246.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 June 2024 |
||