Wind farms
Baby (Poland)| Baby (Poland) |
|
| Operational (0,25 MW) - Dismantled (0,65 MW) |

| Country | Poland |
| County/Zone | Lodzkie |
| City | Goscimowice Drugie |
| Wind farm type | Onshore wind farm |

![]() | 0.25 MW commissioned |
![]() | 0.25 MW commissioned |
![]() | 0.4 MW commissioned |
![]() | 0.25 MW decommissioned |
![]() | 0.4 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Newinco 23 PI 200/250 (x 1) |
| Dismantled | Vestas V25/200 (x 2) |
| Dismantled | Newinco 23 PI 200/250 (x 1) |

| No source available |

| City | Goscimowice Drugie |
| Commissioning | ![]() |
| Turbine | 1x Newinco 23 PI 200/250 (power 250 kW, diameter 23.1 m) |
| Total nominal power | 250 kW |
| Status | Operational |
| Coordinates | Latitude 51° 31' 40" - Longitude 19° 42' 35.7" |
| Precise localization | Yes |
| City | Goscimowice Drugie |
| Commissioning | ![]() |
| Turbine | 1x Newinco 23 PI 200/250 (power 250 kW, diameter 23.1 m) |
| Total nominal power | 250 kW |
| Status | Dismantled (2012) |
| Coordinates | Latitude 51° 31' 40" - Longitude 19° 42' 35.7" |
| Precise localization | Yes |
| City | Goscimowice Drugie |
| Commissioning | ![]() |
| Turbines | 2x Vestas V25/200 (power 200 kW, diameter 25 m) |
| Total nominal power | 400 kW |
| Status | Dismantled (2012) |
| Coordinates | Latitude 51° 31' 40" - Longitude 19° 42' 35.7" |
| Precise localization | Yes |
Databases ![]() Poland (21.6 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Piotrkow (12 km) Popielawy (13 km) Pioma 5.1 (17 km) Gorzkowice (35 km) Enwind Gluchow (38 km) Slupia (42 km) Scieki (45 km) Szadek III (54 km) MOG-8 (54 km) Radomsko (54 km) | ||
|
Insights Production capacity Poland : 11,200.0 MW (end of 2025) Lodzkie : 530.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 24 September 2025 |
||