The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English Français Deutsch Español 

Online access Wind farms Milford Wind Corridor - Phase I (Clipper) (USA)


Previous page
Sign up    Log in    Search


Milford Wind Corridor - Phase I (Clipper) (USA)
Operational (145 MW)


Localisation  

Country USA
County/Zone Utah
City Beaver
Wind farm type Onshore wind farm

Key dates  

 145 MW commissioned

Players  

Developer
Operator #ND
Owner #ND
Manufacturer Clipper

Turbines   

En fonctionnementClipper Liberty C100 (x 58)

Sources  

Pas de source disponible

Informations complémentaires  

Hauteur nacelle
CoordonnéesLatitude 38° 31' 20.3" - Longitude -112° 56' 1"
Altitude1500 m
Localisation préciseOui

Bases de données

     

USA (252.1 GW)
Amériques (614.9 GW)
Monde (2451.9 GW)

Tous les produits



Résumé PDF




Parcs voisins

Milford Wind Corridor - Phase I (GE Energy) (4 km)
Milford Wind Corridor - Phase II (GE Energy) (4 km)


Insights

Puissance installée

USA : 158 826.0 MW (fin 2025)
Utah : 390.7 MW (*)


Légende

#ND : donnée non disponible
(*) : selon la base de données The Wind Power


Mise à jour de cette fiche

17 décembre 2025




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page