Wind farms
Vieiro (Spain)| Vieiro (Spain) |
|
| Operational (19,6 MW) |

| Country | Spain |
| County/Zone | Ourense (Galicia) |
| City | Bande - Verea |
| Wind farm type | Onshore wind farm |

![]() | 13.6 MW commissioned |
![]() | 4 MW commissioned |
![]() | 2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 16) |
| Operational | Gamesa G80/2000 (x 2) |
| Operational | Gamesa G87/2000 (x 1) |

| No source available |

| City | Bande, Verea |
| Commissioning | ![]() |
| Turbines | 16x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 13,600 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 5' 41.4" - Longitude -7° 59' 21.2" |
| Precise localization | Yes |
| City | Bande, Verea |
| Commissioning | ![]() |
| Turbines | 2x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 5' 31" - Longitude -7° 59' 30.1" |
| Precise localization | Yes |
| City | Bande, Verea |
| Commissioning | ![]() |
| Turbine | 1x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 5' 31" - Longitude -7° 59' 30.1" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alto Minho (18 km) Serra do Larouco (24 km) Cabeço Alto (27 km) Arbo (29 km) Deva (30 km) Montouto 2000 (31 km) Fonteavia II (34 km) Fonteavia I (34 km) As Neves (35 km) Terra Fria (36 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Ourense (Galicia) : 320.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 January 2025 |
||